{"id":4171,"date":"2025-11-05T11:58:07","date_gmt":"2025-11-05T08:28:07","guid":{"rendered":"https:\/\/rabinspsteel.com\/projects\/project-management-and-coating-inspection-for-oil-pipeline-systems\/"},"modified":"2025-11-05T11:58:07","modified_gmt":"2025-11-05T08:28:07","slug":"project-management-and-coating-inspection-for-oil-pipeline-systems","status":"publish","type":"projects","link":"https:\/\/rabinspsteel.com\/en\/projects\/project-management-and-coating-inspection-for-oil-pipeline-systems\/","title":{"rendered":"Project Management and Coating Inspection for Oil Pipeline Systems<br>"},"content":{"rendered":"<p>Scope included full project management, contractor selection and evaluation, contract and technical consultancy, drawing review, material list preparation, on-site supervision and inspection, quality documentation, progress reporting, and final project dossier preparation.<\/p>\n","protected":false},"featured_media":4006,"template":"","class_list":["post-4171","projects","type-projects","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/rabinspsteel.com\/en\/wp-json\/wp\/v2\/projects\/4171","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rabinspsteel.com\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/rabinspsteel.com\/en\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rabinspsteel.com\/en\/wp-json\/wp\/v2\/media\/4006"}],"wp:attachment":[{"href":"https:\/\/rabinspsteel.com\/en\/wp-json\/wp\/v2\/media?parent=4171"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}